TONIGHT: The George Washington Bridge ramp connecting the eastbound upper level of the George Washington Bridge to West 178th Street in Manhattan is closed for up to 12 months for deck replacement. 1/3
-
-
Trucks over 13' 6" in height will not be permitted to use the bridge during the duration of the project. Two lanes on the bridge’s upper level westbound side will be closed from 10 p.m. Friday, January 11, through 10 a.m. Sat., January 12. More info: http://www.paalerts.com 3/3
Show this threadThanks. Twitter will use this to make your timeline better. UndoUndo
-
Loading seems to be taking a while.
Twitter may be over capacity or experiencing a momentary hiccup. Try again or visit Twitter Status for more information.