1/ The key to finishing projects on time is to start every single step as late as possible (exactly the opposite of what most PMs do)
Conversation
Replying to
Jonathan Zittrain coined CS version of this as 'procrastination principle' which takes it beyond what's possible with mfg systems
1
6
Replying to
something very interesting brewing here. Intertwingularity rising
3
Replying to
these methods applied to "lean" ends drive output, productivity, efficiency. Towards "fat" ends drive learning, play and freedom
2
1
Replying to
I'm haunted by a Goldratt line: "I'm saying it is possible to systematically develop a marketing breakthrough." Trying to make u mad :)
2
2
specific source is Its Not Luck, his book on the Thinking Processes
3
2
only familiar with The Goal, and the operations research stuff. This stuff sounds like early version of lean startup?
2
1
3
ie my basic stance towards hedgehogs is: cannibalize their thinking irreverently, but don't take them at their own estimation
with foxes it's reverse: be careful what you accept (they can be poison pills), but you can trust their self-estimation more
1