Conversation

Replying to
This is going to be a bitch to put together. But milestone coming up… metal-work. Need to cut that aluminum tubing into pieces with either a hacksaw or a dremel.
Image
Image
2
3
Soft test assembly of the draft build. With construction paper tubes where the aluminum will go. Don’t want to cut metal and then discover a major error. This looks ok I think.
Image
1
2
First metal… cut 100mm strut.is there any use for aluminum filings? Saving it anyway. 9 more to go. Aluminum is much softer than mild steel, but hacksawing it is still a bit of a workout. Needs some filing
Image
Image
Image
3
2
Ok that was really quick. 5 minutes for 3 cuts. Takes some control though. The cutting disc wanders easily. And aluminum stock does get hot.
Image
3
2
Two rocker bogie sub assemblies almost done. Waiting for drill to charge so I can make the pin joint holes larger so these binding posts fit. Took a bunch of filing but I have a nice snug fit.
Image
Image
1
Ugh this was a bitch to do. Tiny M2 mounting screws for SG90 in misdesigned casing, servo horn on bracket, N20 in fork. But good news, the conduit theory of wiring is probably going to work out though it’s gonna be a tight fit.
Image
Image
2
4
Replying to
Not possible to put the screw from the bottom, and just a nut inside (and perhaps print a small placeholder for the nut to “naturally” stay in place?
1