Anyone have experience switching from weekly rotation through projects (eg: project A on Monday, B on Tuesday....E on Friday) to batched rotations (a week on A, a week on B etc but still shipping some of it on a weekly tempo, like if A is a newsletter, you queue up 5 on A-week)?
6
12
I want to try this at least partly but a) I’ve never been good at piling up ship-able inventory; something about the tight do-ship loop works much better for me) b) the practical gear shift seems kinda awkward to pull off unless I take on a very heavy week or two to transition.
1
2
I’m imagining the gains are in fewer context shifts (1-2 a week instead of 1-2 a day), but at the cost of longer feedback loops.
1
I have 3 weekly shipping things I fully control (2 newsletters and a blog), one I don’t fully control and can’t batch (consulting) and 2 cumulative projects with months between shipping events. I’d like to try batching everything except consulting.
1
1
Update : Rotating projects on a weekly basis doesn’t work for me (week 1 = project 1, week 2 = project 2...) because latencies are too high. I need to touch most projects at least once a week or they die.
2
7
Trying out a new rotation approach. 1 week/mode, by energy. Week 1 = maintenance on all projects (highest energy) Week 2 = problem solving on all Week 3 = new starts/discovery/exploration/learning on all Week 4 = future planning/visioning/brainstorming on all (lowest energy)