Hakutulokset
  1. 4. heinäk. 2020

    Happy 4th of July from the team!

  2. 1. tammik.

    Happy New Year from the SLS team!

  3. 23. tammik. 2020

    We’ve started the Green Run test campaign with Core Stage 1’s final lift into the B-2 test stand. The mission is about to get fired up.

  4. 31. jouluk. 2020

    Happy 2021 from the team! Wishing you and yours a healthy and happy year ahead full of new discoveries, breakthroughs, and ideas.

  5. 5. marrask. 2021

    NERD OUT! 🧠 It’s a giant rocket, but did you know SLS core stage tanks can shrink by up to 6 inches in length and 1 inch in diameter when filled with supercold propellants? 🥶 Connections must expand, slide, telescope, or bend to account for shrinkage.

  6. 25. jouluk. 2020

    You've seen bells jingling, but what about SLS engines gimbaling? Even the RS-25 engines couldn't resist a little holiday cheer this year! Wishing you and yours a safe, restful, and joyous holiday season from the team ☃️

  7. 16. tammik. 2021
  8. 25. jouluk. 2021

    May all your holiday celebrations be bright this year. 🎄 Happy Holidays from the team!

  9. 6. marrask. 2021

    Check out this 1:10 scale of our Moon rocket! America’s most powerful rocket, the Space Launch System, stretches 322 feet high!

  10. 26. marrask. 2020

    the SLS rocket could carry 881 pumpkins to the Moon for a very festive ? Wishing you a safe and happy Thanksgiving holiday from the team! 🍂

  11. 11. marrask. 2021

    Today, the team honors the brave men and women who have served our country in the armed forces. Thank you for your service.

  12. 9. heinäk. 2019
  13. 8. marrask. 2021

    NERD OUT! 🧠 If the SLS core stage liquid oxygen and liquid hydrogen tanks were the size of a beverage can, their walls would be half as thick as the walls of that can you’re drinking from. 🥫

  14. 25. syysk. 2020

    As we ensure is ready for the first flight of 's program, stay up-to-date with the latest news on Green Run >>

  15. 30. kesäk. 2020

    The flight computers and avionics of the core stage were powered on and have completed a thorough systems checkout. The SLS avionics power on and checkout is the second of eight tests in the Green Run test series. MORE >>

  16. 24. marrask. 2021

    The core stage of the SLS stores 730,000 gallons of super-cooled liquid hydrogen and liquid oxygen that will fuel the RS-25 engines. We hope you fuel up tomorrow with a delicious Thanksgiving meal!

  17. 26. toukok. 2018

    Standing next to the rocket i’ll be working on. This is a 1:10 scale model of the real thing.

    Näytä tämä ketju
  18. 6. tammik. 2021

    Check-out this Launch Vehicle Stage Adaptor (LVSA) panel produced for

  19. 15. lokak. 2018
  20. 24. elok. 2018

    Inside look at the liquid hydrogen tank from at assembly facility last week.

    Näytä tämä ketju

Lataaminen näyttää kestävän hetken.

Twitter saattaa olla ruuhkautunut tai ongelma on muuten hetkellinen. Yritä uudelleen tai käy Twitterin tilasivulla saadaksesi lisätietoja.