This ended up being something of a harbinger for the overall design "strategy" for the game: A completely design-driven attitude, with programmers expected to be little more than obsequious, subservient go-fers toward the "real men" in the room.
-
Näytä tämä ketju
-
Make no mistake, there were many great designs that were put forth, but which simply couldn't be delivered on due to the incredible time pressure that we were under. Indoor, more linear, levels. A volcano blowing its top, leading to a mass rescue mission.
1 vastaus 0 uudelleentwiittausta 0 tykkäystäNäytä tämä ketju -
At April's outset, even our design tool, "Zod", hadn't come fully online. Lua script was handled by hand. Metadata was written by hand. By this point we were crunching, again, 60-80 hours a week. At the end of April, Metropolois didn't even have a city with proper buildings.
1 vastaus 0 uudelleentwiittausta 0 tykkäystäNäytä tämä ketju -
None of us were under any illusion that we were ever going to hit that 0-bug, Golden Master date that was merely weeks in the future, in the state that the game was in. Yet we were urged, forced even, to crunch by our superiors. Two days before the GM date, a reprieve.
1 vastaus 0 uudelleentwiittausta 1 tykkäysNäytä tämä ketju -
Management announced that they'd reached a deal with WBIE, and would be shifting the game's release date to coincide with the DVD release of the movie. We had an additional six months to finish the game. What was the design department's first reaction? Well.
1 vastaus 0 uudelleentwiittausta 0 tykkäystäNäytä tämä ketju -
You might expect that the sensible reaction would be, "Great! What can we salvage and make as polished as possible?" But remember, we were dealing with both newbie designers, and a design-fellating workflow. Instead, what was asked was, "Great! What new features can we put in?"
1 vastaus 0 uudelleentwiittausta 0 tykkäystäNäytä tämä ketju -
Inevitably, we wound up with 2-3 months of some strange semblance of normalcy, followd by another 2-3 months of crunch. Meet the new boss, same as the old boss. Somehow, we passed Microsoft TCRs in time. Somehow, we managed to outsource the PS2/Xbox ports.
1 vastaus 0 uudelleentwiittausta 1 tykkäysNäytä tämä ketju -
It was a miserable slog for a miserable game. I forget which person it was who I followed, exactly, who pointed out that for every gem of a game made with crunch, the majority are just forgotten about, leaving the devs hollow. But that was how it was with Sub-Par Man Returns.
1 vastaus 0 uudelleentwiittausta 5 tykkäystäNäytä tämä ketju -
A last fun bit: One day, our EP (Chris Gray, previously known for his amazing work on Fiendish Freddy's Big Top O'Fun, so no wonder he was an EP on a multi-million franchise) encouraged us to look out the window. He'd bought a Ferrari. We were crunching. He bought a Ferrari.
1 vastaus 0 uudelleentwiittausta 7 tykkäystäNäytä tämä ketju -
Vastauksena käyttäjälle @TheMogMiner
And here I was, 12 years old, telling my grandma that I wanted Superman Returns for PS2 for Christmas. She ordered it out of the JC Penny catalog. I enjoyed it, at least, lol.
1 vastaus 0 uudelleentwiittausta 0 tykkäystä
As far as I'm aware, the ports were actually not that terrible on a technical level. It's more that they were just constrained by the lukewarm design of the primary SKU (X360).
Lataaminen näyttää kestävän hetken.
Twitter saattaa olla ruuhkautunut tai ongelma on muuten hetkellinen. Yritä uudelleen tai käy Twitterin tilasivulla saadaksesi lisätietoja.