1/ I wasted hours on this: * while tidying up structured cabling / running ethernet to new rooms, decided to standardize "phone on blue"
-
-
12/ So factory RE-USES the 8-position punchdown block between all of the keystone jacks. Just don't put metal contactors in all positions
Show this thread -
-
14/ They DO apply a sticker that has 6 labels that sorta match up against the 8 locations. Sorta.
Show this thread -
15/ Somewhere in this process I had switched from a keystone jack from factory A, where the FIRST pair of locations had no contacts
Show this thread -
16/ to a jack from factory B, where the LAST pair of locations had no contacts.
Show this thread -
17/ The stickers were exactly the same, though. In fact, at first I thought that there were just 6 locations in the punchdown block
Show this thread -
18/ So anyway I'd been sticking blue wires into metal-less plastic recptacle, pushing down, testing, pulling blue and pushing brown, testing
Show this thread -
19/ back and forth back and forth and every single thing I could test was good and NO jacks worked
Show this thread -
-
21/ all better now, though Time to either apply for some contract work...or go down to workshop and build a sign for end of driveway.
Show this thread
End of conversation
New conversation -