trying to work on the outline for Ari 3 and 4, but the text files are just too intractable going to try a spreadsheet 13 threads x 7 acts small grid
-
-
3/ you joke, but I've thought about this Gantt is overblown bc it allows longer and shorter tasks, and for dramatic purposes I want synchronization points where things are FORCED to all happen at the same time that's actually super key >>>https://twitter.com/DavidKMagnus/status/1453749369140826122 …
Show this thread -
4/ and in my spreadsheet I'm actually STARTING with those synchronization points first and then fitting plot points in around them I've got several days of just reviewing existing text files and filling in the grid...once that's done I'll be able to see the empty grid squarespic.twitter.com/22jGv5GGIE
Show this thread -
5/ some blank cells get filled with black bc that thread has terminated / merged with some other thread the remaining blank cells need content once that's done, each gets turned into 3-5 chapters (
Show this thread -
6/ (imagine expanding the precis for season 3 of some long-narrative-arc TV show into an overview of, say 10-12 episodes) And then once THAT's done, I can break each chapter into 3-5 beats I've already done half of this work, but it's scattered across 13 different txt files
Show this thread
End of conversation
New conversation -
-
-
I wonder if that's a good use case for Gantt chart software? lol
Thanks. Twitter will use this to make your timeline better. UndoUndo
-
-
-
Is that subplots in columns and time in rows (or vice versa), or is there a further nuance I'm missing?
Thanks. Twitter will use this to make your timeline better. UndoUndo
-
Loading seems to be taking a while.
Twitter may be over capacity or experiencing a momentary hiccup. Try again or visit Twitter Status for more information.