THANKS, DAD I NEVER WOULD HAVE THOUGHT OF THAT MYSELF WHAT IS THE CHANCE THAT I WAS MEASURING PLYWOOD THIS MORNING WITH CALIPERS AND CUSTOM RIPPING 2x6s TO WIDTH, DO YOU THINK ?https://twitter.com/bara/status/1237441432970883072 …
-
-
6/ I know this is intended as gentle teasing, but to let you know how deep the OCD goes: actually, yes, I DO do a full dimensioned drawing for everything, on graph paper, then generate a cut list (with part IDs), then put check marks as I cut pieceshttps://twitter.com/tr0g/status/1237445231253041153 …
Show this thread -
7/ it's not CAD and you're correct, there aren't tolerances ...but I do generate plans, label them, then file them away in a 3 ring binder in case I ever want to make another one years later (and sometimes I do)
Show this thread
End of conversation
New conversation -
-
-
Sounds like you didn’t do a fully dimensioned and toleranced drawing prior to build and are just relying on the installer to fix any design mistakes. Typical contractor. SMDH.
Thanks. Twitter will use this to make your timeline better. UndoUndo
-
Loading seems to be taking a while.
Twitter may be over capacity or experiencing a momentary hiccup. Try again or visit Twitter Status for more information.