1) When we moved to that facility ('84 I believe) we only needed one trading floor. Leo Melamed and others authorized $27 million or so to construct the shell of another trading floor directly above.
-
-
-
2) When dramatic growth meant we needed the space ('89?) it was a $25-30 million project to built out the second trading floor. In the meantime, when CBOT required a more space and built a new trading floor it was something like $250 million.
- Show replies
New conversation -
Loading seems to be taking a while.
Twitter may be over capacity or experiencing a momentary hiccup. Try again or visit Twitter Status for more information.