Boston-Albany main line:
- 60 min headways to Albany
- 30 min headways to Springfield
- 15 min headways to Worcester
#TrainTwitter goals
-
Show this thread
-
This would almost certainly require adding track to the line so that freight service doesn't get throttled
2 replies 0 retweets 1 likeShow this thread -
I didn't mention in first tweet but this also presumes electrification of the line and switch to MUs for passenger trains
3 replies 0 retweets 0 likesShow this thread -
Rehab branches to Lower Falls (Newton/Wellesley), Saxonville (connection to Shopper's World in Framingham!), for passenger service
1 reply 0 retweets 0 likesShow this thread -
Also, direct connection to Logan Airport via Grand Junction Line--very high priority, prob higher than aforementioned branch lines
1 reply 0 retweets 0 likesShow this thread -
Not sure how well electrifying the line would work with double-stack freight...any examples of double-stack under catenary wire?
2 replies 0 retweets 1 likeShow this thread -
Replying to @380kmh
Okay, looks doable. On the NEC/PRR territory, they have double stacks under the wires, just a matter of structure gauge.
1 reply 0 retweets 1 like
excellent! glad to know