Boston-Albany main line:
- 60 min headways to Albany
- 30 min headways to Springfield
- 15 min headways to Worcester
#TrainTwitter goals
-
Show this thread
-
This would almost certainly require adding track to the line so that freight service doesn't get throttled
2 replies 0 retweets 1 likeShow this thread -
I didn't mention in first tweet but this also presumes electrification of the line and switch to MUs for passenger trains
3 replies 0 retweets 0 likesShow this thread -
Replying to @380kmh
IIRC, that would impact container traffic since I don't think you can run double stacks with catenary.
1 reply 0 retweets 0 likes
Replying to @PWilliamKitty
I was wondering about this--in which case you'd need fully parallel freight and passenger tracks, no sharing
7:49 AM - 4 Oct 2017