Boston-Albany main line:
- 60 min headways to Albany
- 30 min headways to Springfield
- 15 min headways to Worcester
#TrainTwitter goals
This would almost certainly require adding track to the line so that freight service doesn't get throttled
-
-
I didn't mention in first tweet but this also presumes electrification of the line and switch to MUs for passenger trains
Show this thread -
Rehab branches to Lower Falls (Newton/Wellesley), Saxonville (connection to Shopper's World in Framingham!), for passenger service
Show this thread -
Also, direct connection to Logan Airport via Grand Junction Line--very high priority, prob higher than aforementioned branch lines
Show this thread -
Not sure how well electrifying the line would work with double-stack freight...any examples of double-stack under catenary wire?
Show this thread
End of conversation
New conversation -
-
-
Yeah, it's single track over the Berkshires.
-
it's double track between Pittsfield and Springfield, idk between Pittsfield and Albany
-
That's where the single track section is, unless things have changed since 2010.
-
I believe you, I just haven't checked the area for myself
End of conversation