I have a proposal to fix this problem at Jamaica on the LIRR. Not even that much construction needed!
-
-
The frequency on the Main Line is okay off-peak, and very high at the peak. (Part of the plan is to eliminate express trains.)
-
At the peak nothing should wait on the Main Line, to reduce delays; the point is to reduce schedule padding to allow for fast locals.
End of conversation
New conversation -
Loading seems to be taking a while.
Twitter may be over capacity or experiencing a momentary hiccup. Try again or visit Twitter Status for more information.