wccllc

  1. Posted 'WCC Library Learning Commons Service Desk Virtual Tour' to blip.tv: http://blip.tv/file/2790671
  2. We plan to use dry-erase wall paint in the study rooms & classroom in the new building! How cool is that? http://bit.ly/jm1Bn
  3. We have received the pre-final plans for the new building! Now for the careful review. http://yfrog.com/0z8f8j
  4. Projected Project Timeline: Complete Design 09/09; Bid 10/09; Award Contract & Notice to Proceed 01/10; Construction 02/10; Completion 07/11
  5. Presentation: "Green Library - Silver Standard" by Architects Hawaii's LEED specialist Glen Yokotake, today at 11am in WCC's Hale Kuhina 115
  6. Meeting with the architechs about the data, power & furniture plans. http://twitpic.com/1k2wa
  7. As a "green" building, the LLC will have solar panels.
  8. See an animated virtual fly-thru of WCC's planned Library Learning Commons building http://bit.ly/JVwy
  9. The power has come back on, and the Library has network access again.
  10. Our plans for the new building include a classroom for information literacy instruction - with computers!
  11. The LLC will have a media lab, group study rooms, the Tutoring Center, and more! The latest draft floor plans at http://tinyurl.com/48y44n
  12. The architects' conceptual floor plans reveal a three-story atrium to maximize natural light The view should be great, too!
  13. People filling out our Library Survey at http://twurl.nl/wtvlxr have lots of great suggestions about the new building.
  14. Trying to figure out which areas of the new building will need air conditioning and which can have natural ventilation. Hmmm. Any ideas?
  15. See "Commons 2.0" by Bryan Sinclair at http://tinyurl.com/2hku7b to get an idea of what we envision for the new building.
  16. Proposed Timeline: Planning & design through spring 2009; Construction summer 2009 through end of 2010; completion in early spring of 2011.
  17. We met with Architects Hawaii, who use an "integrated design" approach to planning- apropos for an integrated services & resources building!
  18. We put Conceptual floor plans on display in the Library, along with envelopes to take your suggestions on furniture, layout, design, & more.