Profile_bird

Hey there! GreenLogHome is using Twitter.

Twitter is a free service that lets you keep in touch with people through the exchange of quick, frequent answers to one simple question: What's happening? Join today to start receiving GreenLogHome's tweets.

Already using Twitter
from your phone? Click here.

GreenLogHome

  1. finally getting a bit closer to the finish line. installed a kitchen sink . this week i am tackling the downstairs bathroom
  2. We finally have our Septic approval letter. It took forever with many revisions. Now the hard part is trying to recoup some of the cost
  3. FSC labelling - what does it mean? http://twurl.nl/wkc4bd
  4. our beautiful showerbase came warped. what a PITA, the store is 45 mins away, not a fun return to have to make, it is 4'x3'x3' damn
  5. waiting for the final sign off by the DEP on our septic field. we submitted an as built for the final. Friday is the day
  6. Constant pressure pumps? Traditional wells have grown up in modern times. Our well can deliver up to 100psi constantly,60 is a great shower.
  7. uploading pictures to our main website now. More than 300 new pics going up of all kinds of green building solutions we have incorporated.
  8. DEP approved our septic. I spent the last week getting the green log home ready to be lived in. less than a month and we will be inside
  9. Met with log home company today to discuss some issues with our construction. Seems double toe nailing was skipped in 2 places causing twist
  10. our bamboo floors are installed and look amazing. we are doing the light switches and outlets next. we are not far from a c/o now
  11. 2000 feet of of cable and conduit. natasha and I ran it all. such a huge task to accomplish check out www.greenloghome.com/trench.m4v
  12. The electric supplies arrived and the trenching has started. we have were able to get 400 feet done today
  13. today our geothermal trenching will be complete. the electric is next up for tomorrow, 800 feet of trenching to bring power in
  14. Currently Browsing: http://is.gd/smSM
  15. The Bamboo floors arrived today. 5,500 pounds of bamboo. thats a lotta wood. Its all sustainable materials. 6" planks all 8' long. beautiful
  16. Our roof can withstand Hurricane winds over 150 mph, and has a class 4 impact resistance (they fired 2x4's as a test). we built a fortress!!
  17. I learned today our roof is so well made it is water tight under 6 inches of standing water. can you imagine 6 inches of water and no leak?
  18. Poor Fred, he's been running around in the pouring rain, dealing with all the issues, while I was working online in the camper in the woods!
  19. What a day, pouring rain and the 7000 pounds of metal roofing finally arrives. After a long unload we planned out strategy for install.
  20. On top of rain we had visits from the DEP, geothermal crew, and our bank