- Dismantled the other four main boom sections.
4:56 AM Aug 18th, 2009
via TwitPic
-
- Transporting head boom.
4:49 AM Aug 18th, 2009
via TwitPic
-
- Repositioned auxiliary mobile crane
4:10 AM Aug 18th, 2009
via TwitPic
-
- Head boom is loaded on lowbed.
3:18 AM Aug 18th, 2009
via TwitPic
-
- Unloading counterweights.
3:10 AM Aug 18th, 2009
via TwitPic
-
Dismantling main boom cables from main body
2:50 AM Aug 18th, 2009
via web
-
- Unloading counterweights.
2:32 AM Aug 18th, 2009
via TwitPic
-
- The other trailer is coming backwards to pad no.9
2:29 AM Aug 18th, 2009
via TwitPic
-
- Lowering down the derrick.
2:03 AM Aug 18th, 2009
via TwitPic
-
- Main boom extension is loaded on trailer.
1:47 AM Aug 18th, 2009
via TwitPic
-
- Dismantled main boom extension.
1:34 AM Aug 18th, 2009
via TwitPic
-
- Boom extention upper connectors are dismantled
1:24 AM Aug 18th, 2009
via TwitPic
-
- Dismantling connection cables.
1:24 AM Aug 18th, 2009
via TwitPic
-
- Lifting main boom by the help of 130 ton capacity mobile crane to be able to dismantle boom extension
1:05 AM Aug 18th, 2009
via TwitPic
-
- Pulling wire rope.
12:45 AM Aug 18th, 2009
via TwitPic
-
- Dismantling hook.
12:40 AM Aug 18th, 2009
via TwitPic
-
- Moving trailer by the help of forklift.
12:24 AM Aug 18th, 2009
via TwitPic
-
- Lowering down the boom.
11:54 PM Aug 17th, 2009
via TwitPic
-
- Crane is positioned to be dismantled.
11:34 PM Aug 17th, 2009
via TwitPic
-
- Mobile crane is positioned near steel plates.
9:59 PM Aug 17th, 2009
via TwitPic
|
- Name Yigit N
- Location Belen
- Web http://www.WindOn...
- Bio Here you can find instant progress report about 30 MW Vestas Belen Project.
|