Get short, timely messages from 55th and Hardy.

Twitter is a rich source of instantly updated information. It's easy to stay updated on an incredibly wide variety of topics. Join today and follow @55thandHardy.

Get updates via SMS by texting follow 55thandHardy to 40404 in the United States
Codes for other countries

Two-way (sending and receiving) short codes:
Country Code For customers of
Australia
  • 0198089488 Telstra
Canada
  • 21212 (any)
United Kingdom
  • 86444 Vodafone, Orange, 3, O2
Indonesia
  • 89887 AXIS, 3, Telkomsel
Ireland
  • 51210 O2
India
  • 53000 Bharti Airtel, Videocon
Jordan
  • 90903 Zain
New Zealand
  • 8987 Vodafone, Telecom NZ
United States
  • 40404 (any)

55thandHardy

  1. Kitchen counters, flooring, and doors!! Come take a look at the model unit for a look inside a unit. Happy Friday. twitpic.com/4o5szu
  2. Bathrooms are coming along nicely. twitpic.com/4o5s2x
  3. We are almost finished with the scratch and brown coat in the interior courtyards. It's also Friday. YAY!! have a goodie twitpic.com/4ftjh5
  4. Congrats to SDSU for killing it and making the fans proud! Let's win this thing!
  5. Site work has begun. This things starting to come together. twitpic.com/486u6p
  6. We are coloring the south side of the buildings exterior today! Yay! twitpic.com/3v9g5j
  7. The scratch and brown coat is now complete on the south elevation. Drywall is now hung on the 3rd floor too. http://twitpic.com/3s5541
  8. Applying scratch coat of exterior plaster today on the south and west elevation. Check it out! http://twitpic.com/3r7tn8
  9. South elevation ready to lath on Monday. Have a great weekend everybody. http://twitpic.com/3q1jhg
  10. lane closure today at 55th and Lindo Paseo. Crane is loading the roof tile. Should be done by 11am. Happy Monday! http://twitpic.com/3ottn5
  11. we are in full drywall mode. 1st floor is nearly complete. Have a great weekend! http://twitpic.com/3nxwqx
  12. Merry Christmas. Happy birthday Jesus!
  13. *lath, not path. Dang autotyper
  14. South elevation path has begun. Yay! http://twitpic.com/3g9thk
  15. Here is a pict of the roof. Framing is almost done. Crane is to be removed on Monday. http://twitpic.com/3cb6mk. Have a good weekend.
  16. @ASHLEYorAQUANAE hoping to get leasing information out in early spring! Not sure of the exact price points just yet. Stay tuned in 4 details
  17. @ASHLEYorAQUANAE: I do not believe pricing has been set yet. In the meantime, check out the website for updated info: thegranadaonhardy.com
  18. 4th floor walls are complete. Roof trusses and meeting to begin soon http://twitpic.com/398nlg. Quick note: crane to leave site on Dec. 8th
  19. Standing walls on the 4th floor today. Framing is looking to be complete by next week. Crane to leave the site by Dec 3rd
  20. @kgunner08 it is for the crane. Sorry. Only 2 more weeks and the crane goes away